Details:
13,50,000 sft project with two 6-storied commercial buildings, a 17-story and a 28-story residential buildings atop a common podium slab over two basement parking levels..
Components:
PT slabs, RC beam-column + RC shear walls.
Services Provided:
As a Proof Checking Consultant (PCC) for the GIFT City, SMV teamed up with H+P, Chicago to undertake a structural peer review for this project. A comprehensive peer review report documenting all deficiencies and recommendations for improving building performance and optimizing structural system was provided to the GIFT City in close coordination with the engineer of record. Final structural design documents were reviewed and approved by SMV.
Project Highlights:
Four separate buildings of varying heights with different lateral force resting systems transferring lateral load to a common podium at ground level required careful evaluation of the load path. SMV provided critical design guidance to the EOR regarding design issues. We helped augment building performance and optimize structural system.